Construction Management and Procurement

113 questions

Sign in to use this feature.

Read mode

Construction Management and Procurement - sample questions with answers

  1. 1. During which stages is the technical audit of a project conducted?

    Show answer

    Answer: Implementation and post-implementation stages

    Technical audits of a project are conducted during the implementation and post-implementation stages.

  2. 2. What is the process of testing whether a decision or action is against the law called?

    Show answer

    Answer: Ethical filter

    An ethical filter tests whether an action or decision is against the law.

  3. 3. What is the full form of PERT in project management?

    Show answer

    Answer: Programme Evaluation and Review Technique

    PERT stands for Programme Evaluation and Review Technique.

  4. 4. On what is the Critical Path Method (CPM) network based?

    Show answer

    Answer: Activity

    CPM network is activity oriented, whereas PERT network is event oriented.

  5. 5. According to the Public Procurement Act 2063, price adjustments are permitted for contracts with a duration exceeding how many months?

    Show answer

    Answer: 15 months

    Under the Public Procurement Act 2063, price adjustments are permitted for contracts with a duration exceeding 15 months.

  6. 6. The Nepal Engineering Council (NEC) is an autonomous body established under which Act?

    Show answer

    Answer: NEC Act 2055

    The Nepal Engineering Council is an autonomous body established under the NEC Act of 2055.

  7. 7. When was the Nepal Engineer's Association established?

    Show answer

    Answer: 2024 BS

    The Nepal Engineer's Association was established in 2024 BS.

  8. 8. Which two processes are involved in quality control?

    Show answer

    Answer: Detection and Prevention

    Quality control involves both detection and prevention.

  9. 9. Which of the following procurement methods is not applicable for material management?

    Show answer

    Answer: Cost and quality-based selection

    Cost and quality-based selection is not a procurement method applicable for material management.

  10. 10. What is the total float of activities on the critical path?

    Show answer

    Answer: Zero

    Activities on the critical path have a total float of zero.

  11. 11. What is the person designated within a construction contract for the resolution of disputes called?

    Show answer

    Answer: Contract Adjudicator

    A contract adjudicator is a person designated within the contract for the resolution of disputes.

  12. 12. According to engineering ethics, which action is considered unethical?

    Show answer

    Answer: Reviewing another engineer's work without consent

    Reviewing the work of another engineer without their consent is considered unethical.

  13. 13. Which document is used to record wages in construction management?

    Show answer

    Answer: Muster roll

    In construction management, a muster roll is used to record wages.

  14. 14. What is meant by 'Crashing' in project management?

    Show answer

    Answer: Reduction of project duration

    Crashing refers to the reduction of project duration.

  15. 15. What is the full form of CPM used in project management?

    Show answer

    Answer: Critical Path Method

    CPM stands for Critical Path Method.

This chapter has 113 questions. Practise them all with timing, answers and explanations.